Kuala Lumpur PIPE ROOF PROJECT

malaisie-KL.jp2

Kuala Lumpur, the capital of Malaysia, is famous for the Petronas Twin  Towers,
which boasts a height of 451m. As the city continues to develop day by day, it is in an urgent need to further improve the transportation network.
The KVMRT (Klang Valley Mass Rapid Transit), which connects the east and west of the metropolitan area, is under construction.

The plan is to cross several aortas of the transportation network, and the pipe roof 
method with Unclemole Super has been adopted for the  underground crossing of the Kuala Lumpur Seremban Expressway, and it is currently under excavation. Since it is a big project, we have daily  inspections and safety inspections, and we are aiming for the
early completion of the construction with a close attention.

海外パイプルーフ3.jpg
​Reception Shaft
​Starting Shaft

CONSTRUCTION SUMMARY

Construction Site: Kuala Lumpur, Malaysia
Pipe Type: Steel pipe
φ800mm×9m
Pipe Roof Length: 60m×23no.×2places
Total Length: 2760m
Soil Condition: Sandy Gravel
​Minimum earth cover depth: 4m
​Construction site

UNCLEMOLE SUPER

Outer diameter:812mm
Machine Length: 3020mm
Weight:3800kg
Crusher type: Cone crusher

マシン01のコピー2.jp2

MACHINE SPECIFICATION

​Unclemole Super
断面図(パネル用).png
Overview of the PIPE ROOF Project
海外パイプルーフ2.jpg
​Arrival Shaft
​Starting Shaft
Plan view of the construction site
管降ろし01.JPG
9m steel pipe installation for jacking equipment
2班施工中(5本目).JPG
9m steel pipe jacking
平面図.png
​Cross section of the PIPE ROOF
マシン架台上.JPG
​Installed Unclemole on the construction site
マシン03.jp2
Unclemole Super is about to start jacking
4本完了.JPG
After the completion of a pipe jacking