top of page

Philippines Manila metropolitan Area 
Water pipe installation project

スクリーンショット 2021-10-04 15.11.37.png

Water and sewage projects are outsourced to private companies in the Manila metropolitan area. It has been a long time since the water and sewer pipes were laid, and the laid pipes have deteriorated over time. A water and sewer pipe replacement project is planned.Initially the project was designed by Open cut method.However, due to the traffic situation in Manila in recent years, the construction has been changed to a Trencheless method because it may cause further traffic congestion when construction is performed. It is possible to minimize the negative impact on traffic, which is a feature of Trenchless work. In the future water supply and sewerage business, Trench less construction will be the main construction method.

0456.jpg

Dimensions of shield

Unclemole TCK1200

Outer diameter 
Length 
Weight

Crushable Cobble diameter 
 

1350mm
3315mm 
13.3t 

480mm
 

​SUMMARY

Project Name
Pipe type 
Soil Data
Construction Period

:Manila Water pipe installation project
:Steel pipe I.D.1200mm   Length 3m
:Silt            N value=1~3
:Jun 2019- May 2020